Products

Various amusement facilities products

  • EU CE certification

    EU CE certification

  • SGS Certification

    SGS Certification

  • Bureau Veritas

    Bureau Veritas

  • Quality management <br/>system certification

    Quality management
    system certification

Product introduction

Snow Theme Mini Pirate Ship

Brief introduction to the main structure and working principle of children’s pirate ship
1. Mechanical system: The rotation of the DC motor drives the rubber wheels to push the bottom of the boat, and drags the dragon boat to swing back and forth.
After the movement is over, the cylinder drives the motor to brake the equipment to stabilize the hull.
2. Electrical system
(1) The electrical system is composed of an electrical control box, a rectifier, a drive motor, and a decorative circuit for colored lights.
(2) The working principle of the electrical system
The 220V power supply enters the electrical control box through the main power switch, first connect the leakage circuit breaker in the control box, press the “preparation button”, the circuit will make a preparatory bell for about 6 seconds; then press the “start button” and the circuit will enter the timing Running state; the motor is powered to drive the amusement machine to run.
3. The pneumatic system consists of a cylinder and an air compressor

Scope of application

WORKING PRINCIPLE

Brief introduction to the main structure and working principle of children’s pirate ship
1. Mechanical system: The rotation of the DC motor drives the rubber wheels to push the bottom of the boat, and drags the dragon boat to swing back and forth.
After the movement is over, the cylinder drives the motor to brake the equipment to stabilize the hull.
2. Electrical system
(1) The electrical system is composed of an electrical control box, a rectifier, a drive motor, and a decorative circuit for colored lights.
(2) The working principle of the electrical system
The 220V power supply enters the electrical control box through the main power switch, first connect the leakage circuit breaker in the control box, press the “preparation button”, the circuit will make a preparatory bell for about 6 seconds; then press the “start button” and the circuit will enter the timing Running state; the motor is powered to drive the amusement machine to run.
3. The pneumatic system consists of a cylinder and an air compressor

  • 1678151331512

Product parameters

Technical Specification

Technical Specification

Power Supply

3N+PE 380V 50Hz

Installed Power

3kw

Height

3.7m

Capacity

8-12 p

Cover Area

Diameter 5*7m

Note: technical parameters are subject to change without notice

Product Atlas

  • Production process
  • Delivery record
  • Related videos